Bathroom Modernisation

Semi-detached house in Friedberg, built 1976 – a new bathroom in an occupied house

Location
Friedberg
Year built
1976
Scope
Complete conversion of the only bathroom
Duration
Four weeks

Example project – will be replaced by a documented client project.

Starting point

A 1976 bathroom, the only one in the house

A semi-detached house from 1976, the bathroom essentially unchanged: a high-sided bath, a 73.5-centimetre door, tiles from the year it was built. The owners, both around sixty, wanted to do the conversion while they could still plan it themselves – not once it suddenly becomes necessary. One constraint was fixed from the start: it is the only bathroom, and the house would stay occupied throughout.

Brief

Right back to the structural shell

We stripped the bathroom back completely and rebuilt it: pipework, electrics, waterproofing, a level-access shower instead of the bath, a widened door, tiles, sanitaryware and lighting. Deliberately left untouched was the guest WC on the ground floor – it remained as it was and served as part of the interim arrangement during the works.

Handwerker dokumentiert eine freigelegte Wand mit dem Tablet, grüne Laserlinie über dem Mauerwerk, Tageslicht aus der Fensteröffnung
Recorded before the strip-out. The pipe positions and wall build-up of 1976 were recorded nowhere – so everything was documented before and after opening up.

Decisions

Move the drain, build a false wall, widen the door

The level-access shower was decided at the drain: the 1976 pipe sat too high for a clean fall, so the floor was opened and the drain moved – the alternative, a raised platform, would have given up the level access again. The new pipes went into a false wall rather than into chased slots: quicker, gentler on the existing fabric, and the false wall carries the reinforcements for future grab rails at the same time. The door was widened from 73.5 to 86 centimetres – that the lintel above could take it had been settled by the survey of the existing structure beforehand.

Bodengleiche Dusche mit Glaswand und hellen großformatigen Fliesen, Tageslicht durch ein mattiertes Fenster
The fall was fixed before the first tile. Screed, waterproofing and channel were planned to the same level – the old drain had to be moved to make that possible.

Execution

Three weeks planned, with an interim arrangement

The plan was three weeks: strip-out and new pipework, then screed and waterproofing with their drying times, then tiles, sanitaryware, lighting and the new door. A dust screen stood towards the hallway, and by the end of each working day the hallway and stairs were clear and swept. Showering ran via a temporary shower in the basement; the guest WC covered the rest.

Schwellenloser Hauseingang im Mittagslicht: breite neue Eichentür, ebene helle Pflasterfläche, Bepflanzung am Rand
Reinforced before it is needed. Behind the tiles sit reinforcements for future grab rails – fitted now, while the walls were open, not in ten years' time.

Outcome

A week longer than planned

Under the old bath, damp screed came to light – a leak that lay decades in the past and had never been noticed. Eight days of drying turned three planned weeks into four, and the interim arrangement in the basement had to hold for a week longer than promised. The finished bathroom has a level-access shower, a door you can pass through with a rollator, and reinforcements in the walls that you cannot see – photographed before the tiles went on.

Aufgeräumte bewohnte Baustelle am Mittag: gefegter Boden, aufgerollte Kabel, geordnetes Werkzeug auf einer Kiste
Occupied means: passable every evening. The only bathroom was a building site – the hallway and stairs were still swept and clear every evening.
Year built
1976
Carried out
2025
Duration
Four weeks, one of them unplanned
Trades
Strip-out, plumbing, electrics, waterproofing, tiling, drylining
Scope
Around 8 m², stripped back to the structural shell
Of note
The only bathroom in the house – occupied during the works

Let’s talk about your project.

The initial consultation is no-obligation. If we are not the right partner for your project, we will tell you so.

Porträt: Ihr Ansprechpartner Daniel Braun im weißen Hemd vor hellgrauem Hintergrund

Daniel Braun

Your point of contact

When you call or write, he is the one you reach. He takes down what needs doing and gets back to you – even if the answer is that we are not the right firm for the job.

Your project

What happens after your enquiry

  1. A reply within 24 hours on working days.
  2. A short phone call – is the project a good fit for us?
  3. An on-site visit with a building survey.

This website sets no cookies – neither its own nor those of third parties. There is no tracking, there are no analytics tools and no advertising pixels.

So that the site behaves correctly as you click through, your browser remembers three items in session storage:

What is stored

feb-gate-done
whether you have already seen the entrance screen
feb-audio
whether sound is on or off
feb-audio-time
where the audio track has got to

These items never leave your device, do not identify you, and are deleted as soon as you close the tab. Because they serve only the function you triggered yourself, no consent is required for them.